加入收藏
Hello, welcome to Zhangjiagang Shuang Jun Machinery Co., ltd.!

The instructions on high speed grinder

2017-06-27

Place 1, high-speed mill in relatively stable (or adjust a foot to adjust level), the surrounding environment should be clean, dry and ventilated.

2, motor direction of rotation must cover the direction of the arrow.

3, must check before starting the host cavity with and without sundry, must first be examined before material crushing materials are not allowed inside any impurities mixed in.

4, regular inspection activity tooth plate fixed nut for loosening and all binding parts shall not be loose.Especially should check fixed tooth disc screw.

5, lubrication: wherever containing oil cup, right before starting the lubricating oil, should be appropriate to increase the number refueling for continuous work.Actual working hours 300 hours, it is necessary to maintain the spindle bearing cavity clean after replace new lubricating oil.

6, replacement parts and pay attention to when using rolling bearing technology of screw hole, operation is conducted by familiar with this machine repairman.Operational difficulties such as user should contact the factory, do not like.



加载中